Jefferson Barracks National Cemetery Improvement & Cemetery Expansion, Phase 5

Year Complete
2020
Project Size
18.23 acres
Project Location
St. Louis, MO
Services Included
  • Civil Engineering
  • Construction Services

The site was previously part of the St. Louis VA Medical Center. Design and construction services were divided into three phases to better align with the hospital’s demolition and construction schedule. An early turnover burial section 5a was designed to provide additional space for burials during the course of construction. Phases 5a and 5b consisted of an 8.45-acre expansion with 6,248 pre-placed crypts and in-ground cremains divided among 6 new sections. Phase 5c consisted of the remaining 9.78 acres of the expansion, with five new burial sections totaling 9,485 pre-placed crypts and in-ground cremains. Phases included a new restroom building, new asphalt roads, retaining walls, new stormwater pipe and bio-retention ponds.

Key Words: Stormwater Control, Bio-Retention Design, Civil Engineering, Construction Period Services, Cemeteries, Site Development, VA

Image 10-18-23 at 10.38 AM Image 10-18-23 at 10.39 AM Image 10-18-23 at 10.38 AM (1) Image 10-18-23 at 10.37 AM
More Projects