Repair Critical Façade Deficiencies – Phase II

Department of Veterans Affairs – Durham VA Medical Center, Durham, NC

What We Did

This project involved the investigation and repair of the failing façade on a 1950’s brick building – there were cracked and spalling masonry with few expansion joints. A highly constrained project budget required prioritization of repair actions; a selective identification of bid deducts to minimize negative impacts to project objectives; a significant and thorough field investigation to validate existing failed conditions, and; an invasive investigation to confirm presence of asbestos containing materials.

Project Details

Services: Project Management, Engineering, Construction Services, Specialty (Asbestos Survey and Testing)

Budget: Construction – $4,500,000

Partners: SKA, RGG, Matrix Health and Safety Consultants

How We Did

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam, quis nostrud exerci tation ullamcorper suscipit lobortis nisl ut aliquip ex ea commodo consequat.